Mianwali Discussion Forum

Back to Mianwali Online Home



Author:  Umar
E-mail:  not available
Date:  4/2/2010 1:54:58 AM
Subject:  Imran Khan--Kalabagh
Message:  Dr Kalim has opened our eyes.Chashma hydel produces 320 MW and Mianwali needs only 20 MW and even that is not being provided. So many people lost their excellent land and got waste land in exchange and many did not get even that.And what about Chashma nuclear's production.Mianwali is only there to give Qurbani and not share the benefits.Our used secondhand politicians of Mianwali are all responsible for that.Even Imran Khan is doing a criminal act by not fighting for the cause.He is on media every evening repeating same old stories, not for the practical problems of Mianwali.He does not think anything less than a Prime Minister while he does not have enough honest people to make his own small cabinet.I wish he raises our concerns in the media.

Post a Reply

Back to the Folder



 Mianwali (General) -- Discuss anything related to - Mianwali District.
 Kalabagh Dam by khalid khan  at 10/5/2007 3:30:07 AM
 Re: Kalabagh Dam by Arshad Mehmood  at 11/9/2011 11:10:04 PM
 Re: Kalabagh Dam by Zaheer at 8/13/2009 1:58:12 AM
 Re: Kalabagh Dam by Azhar-ul-Hassan  at 8/21/2009 12:49:51 AM
 Re: Kalabagh Dam by QADEER HUSSAIN  at 7/11/2012 4:07:02 AM
 Re: Kalabagh Dam by kalim niazi  at 9/14/2009 12:11:24 AM
 Imran Khan--Kalabagh by Umar at 4/2/2010 1:54:58 AM
 Re: Kalabagh Dam by Nasir at 8/31/2009 10:13:00 PM
 Re: Kalabagh Dam by dr aamer niazi  at 7/14/2009 10:03:55 AM
 Re: Kalabagh Dam by Kashif Ch. at 7/19/2009 11:00:46 AM
 Re: Kalabagh Dam by Kashif Ch. at 7/14/2009 11:48:43 PM
 Re: Kalabagh Dam by dr aamer niazi  at 4/28/2009 1:53:31 AM
 Re: Kalabagh Dam by Zahid Ayub at 6/8/2008 9:54:08 AM
 Re: Kalabagh Dam by Malik Khalil  at 3/21/2008 11:28:42 AM